Before & after.

A closer look at what changed. Brick, stone and tile projects, with photos from different stages of the work.

See all our work

Custom brick masonry

Project details

We refaced this covered front porch with full-bed brick masonry.

Select a photo to see it in full.

Before
House wrap across a covered front porch before brick facing, with scaffold and a ladder on the lawn

House wrap and exposed timber before the brick facing.

After
Brown brick facade behind three porch columns and a concrete landing

The completed full-bed brick facade across the front porch.

Stone pillar rebuild

Project details

We rebuilt this damaged stone entrance pillar to restore its original appearance, including the cap and round finial.

Select a photo to see it in full.

Before
Collapsed stone entrance pillar with exposed concrete blocks and rubble on the path

The damaged pillar, with blocks and stone on the ground.

After
Stone entrance pillars with round finials beside a brick sign and planted border

The rebuilt stone pillar with its cap and round finial.

Window & door alterations

Project details

We removed and rebuilt the brickwork around this window, matching the replacement brick to the existing wall.

Select a photo to see it in full.

Before
Grey brick removed beside and below a window, exposing the backing above a timber deck

Brick removed beside and below the window.

After
Grey brickwork and mortar around a white-framed window above a timber deck

Brickwork restored around the window and stone sill.

Masonry restoration & repair

Project details

We repaired this damaged wall with new brick infill. The photo shows the replacement brick before painting.

Select a photo to see it in full.

Before
A vertical opening in a dark brick wall, showing exposed backing and toothed brick edges

An open strip in the existing painted wall.

After
Unpainted orange brick infill in a dark brick wall, with tools alongside

Brick infill, shown before painting.

Brick gable repair

Project details

We rebuilt the brickwork around this upper-storey window. The photos show the opening before repair and the completed masonry.

Select a photo to see it in full.

Before
Brick removed around an upper-storey gable window, with the opening exposed behind scaffolding

Brick removed around the upper-storey window before the opening was rebuilt.

After
Red brick gable and narrow window above scaffolding, with a bucket and tools in the foreground

Completed brickwork around the window, photographed from the scaffold.

Grey tile tub surround

Project details

We installed large-format grey tile and two recessed niches over a Schluter waterproofing system. The photos show the preparation, tile setting and completed tilework.

Select a photo to see it in full.

Before
Schluter waterproofing board and two recessed niches around a bathtub before tiling

Schluter waterproofing and recessed niches before tiling.

After
Grey rectangular tile and two recessed niches around a white bathtub

The completed tilework and grouted niches around the tub.

More finished work.

Stone veneer and Indiana limestone sills.

Tell us what
you have in mind.

Tell us where the project is and what you’d like done. You can send photos by email.

If verification won’t load, message us on Instagram.

Checking your browser…